Process, Quality and
Support
A project is complete when the committed capacity has been measured on site and the customer's team can operate the system without us.
Project Lifecycle
Projects are run in eight phases; each phase transition depends on approval of a defined deliverable.
Feasibility
Conceptual Design
Detailed Engineering
Procurement and Manufacturing
Pre-assembly and FAT
Site Installation
Commissioning and SAT
Training and Support
Approval gates
| Phase 01 | Investment decision |
| Phase 02 | Concept freeze |
| Phase 03 | Design review |
| Phase 05 | Shipment approval |
| Phase 07 | Provisional acceptance |
| Phase 08 | Final acceptance |
Project organization
- Project manager
- Process engineer
- Mechanical design
- Electrical and automation
- Software and MES
- Quality and safety
- Site supervisor
- Installation team
Duration ranges
| Single machine | 5 weeks |
| Production line | 8 months |
| Complete facility | 15 months |
Quality, Testing and Commissioning
A project is complete when the committed capacity has been measured on site.
Factory acceptance test · FAT
- Mechanical motion and positioning
- Control software functional tests
- Testing of safety functions
- Cycle time with sample parts
- Punch list and corrections
Site acceptance test · SAT
- Cold and hot commissioning
- Capacity and OEE measurement
- Proof of quality conformity
- Verification of safety systems
- Provisional acceptance record
Acceptance criteria
| Cycle time | Average and deviation over the sample quantity |
| Capacity | Acceptable quantity within a defined time |
| OEE | Availability × performance × quality |
| Product changeover | Time from last good part to first good part |
| Safety | Each function triggered separately |
Training, Technology Transfer and After-Sales
A project is complete when the customer's team can operate the system without us.
Training
- Operator and maintenance
- Automation and fault diagnosis
- SCADA and MES usage
- Safety and emergency
- Train-the-trainer
Technology transfer
- Design files
- Process parameters
- Software source code
- Local personnel development
- On-site consulting
After-sales
- Warranty and periodic maintenance
- Spare parts supply
- Remote fault diagnosis
- Capacity increase
- Line adaptation
Documentation delivered
- Mechanical and electrical file
- Automation source code
- Operating and maintenance instructions
- Calibration and maintenance plan
- Spare parts list
- Test and acceptance reports
Response time
| Remote support | 24 hours |
| On-site response | 5 hours |
| Spare parts dispatch | 7 days |
From Start to Finish
Eight steps from the first question of an investment to the first part off the line.
Feasibility
Need, capacity target and investment budget are clarified.
Design
Process flow, layout plan and equipment list are created.
Engineering
Mechanical, electrical and automation projects are made ready for manufacturing.
Manufacturing
Custom machines, stations and panels are produced in our own workshop.
Factory acceptance test
The system is set up in our facility and tested in the customer's presence.
Site installation
Transport, placement, infrastructure connections and alignment are completed.
Commissioning
Capacity is measured on site, acceptance criteria are met and delivery is made.
Training and support
Personnel are trained, documentation is handed over, after-sales support begins.