A project is complete when the committed capacity has been measured on site and the customer's team can operate the system without us.

Methodology

Project Lifecycle

Projects are run in eight phases; each phase transition depends on approval of a defined deliverable.

Phase 01

Feasibility

Phase 02

Conceptual Design

Phase 03

Detailed Engineering

Phase 04

Procurement and Manufacturing

Phase 05

Pre-assembly and FAT

Phase 06

Site Installation

Phase 07

Commissioning and SAT

Phase 08

Training and Support

Approval gates

Phase 01Investment decision
Phase 02Concept freeze
Phase 03Design review
Phase 05Shipment approval
Phase 07Provisional acceptance
Phase 08Final acceptance

Project organization

  • Project manager
  • Process engineer
  • Mechanical design
  • Electrical and automation
  • Software and MES
  • Quality and safety
  • Site supervisor
  • Installation team

Duration ranges

Single machine5 weeks
Production line8 months
Complete facility15 months
F.1

Quality, Testing and Commissioning

A project is complete when the committed capacity has been measured on site.

Factory acceptance test · FAT

  • Mechanical motion and positioning
  • Control software functional tests
  • Testing of safety functions
  • Cycle time with sample parts
  • Punch list and corrections

Site acceptance test · SAT

  • Cold and hot commissioning
  • Capacity and OEE measurement
  • Proof of quality conformity
  • Verification of safety systems
  • Provisional acceptance record

Acceptance criteria

Cycle timeAverage and deviation over the sample quantity
CapacityAcceptable quantity within a defined time
OEEAvailability × performance × quality
Product changeoverTime from last good part to first good part
SafetyEach function triggered separately
Field noteIf acceptance criteria are not defined at the contract stage, the commissioning period is spent on arguments rather than technical work.
F.2

Training, Technology Transfer and After-Sales

A project is complete when the customer's team can operate the system without us.

Training

  • Operator and maintenance
  • Automation and fault diagnosis
  • SCADA and MES usage
  • Safety and emergency
  • Train-the-trainer

Technology transfer

  • Design files
  • Process parameters
  • Software source code
  • Local personnel development
  • On-site consulting

After-sales

  • Warranty and periodic maintenance
  • Spare parts supply
  • Remote fault diagnosis
  • Capacity increase
  • Line adaptation

Documentation delivered

  • Mechanical and electrical file
  • Automation source code
  • Operating and maintenance instructions
  • Calibration and maintenance plan
  • Spare parts list
  • Test and acceptance reports

Response time

Remote support24 hours
On-site response5 hours
Spare parts dispatch7 days
Field noteIn projects that leave training until after commissioning, it takes months for the line to reach its real capacity.
Project summary

From Start to Finish

Eight steps from the first question of an investment to the first part off the line.

01

Feasibility

Need, capacity target and investment budget are clarified.

02

Design

Process flow, layout plan and equipment list are created.

03

Engineering

Mechanical, electrical and automation projects are made ready for manufacturing.

04

Manufacturing

Custom machines, stations and panels are produced in our own workshop.

05

Factory acceptance test

The system is set up in our facility and tested in the customer's presence.

06

Site installation

Transport, placement, infrastructure connections and alignment are completed.

07

Commissioning

Capacity is measured on site, acceptance criteria are met and delivery is made.

08

Training and support

Personnel are trained, documentation is handed over, after-sales support begins.

All eight steps are carried out under a single responsibility.